How do I connect the 5820XL to central station monitoring using the built-in DACT?

0

To connect the 5820XL to a central station, you must use the built-in dual phone line DACT connected to two RJ31X jacks. The system must be wired upstream of all other telephone equipment to ensure priority signaling during an alarm.

  1. Connect two phone lines to the panel using RJ31X jacks (Page 1) [1].

  2. Wire the lines so the FACP is upstream of all other premise telephone equipment (Page 2-2) [1].

  3. Enable phone line monitors for both lines in the panel programming (Page 2-3) [1].

  4. Program the central station phone number and an automatic daily test time (Page 2-3) [1].

  5. Set the AC Loss Hours to 1-3 hours and Attempts to Report to 5 (Page 2-3) [1].

  6. Select a compatible reporting format, such as SIA or Contact ID, for the dialer outputs (Page 8-18) [1].

AI-generated — verify against your panel's documentation and applicable codes (NFPA 72, local AHJ).

Comments

Loading comments...
Sign in to leave a comment