How do I perform a walk test on the NFS2-3030?

NotifierNFS2-3030Mar 27, 202685 views
0

To test the NFS2-3030, perform manual operational checks or print results from the Walk Test menu. You must physically disconnect all releasing devices before beginning, as software disables are not a substitute for a physical lockout (Page 58) [1].

  1. Notify the fire department, central station, and facility personnel (Page 58) [1].

  2. Physically disconnect all releasing devices to prevent accidental activation (Page 58) [1].

  3. Press and hold LAMP TEST to verify all display segments and LEDs function (Page 58) [1].

  4. Activate an initiating device and confirm that programmed notification appliances and indicators activate (Page 58) [1].

  5. Reset the panel and repeat for each initiating device on the system (Page 58) [1].

  6. Return all circuits to pretest condition and notify authorities when finished (Page 59) [1].

AI-generated — verify against your panel's documentation and applicable codes (NFPA 72, local AHJ).

Comments

Loading comments...
Sign in to leave a comment