What is the procedure for performing a walk test on the FlexES panel to verify detector and module operation?
0
I couldn't find a specific walk test procedure in the provided manuals. The documentation states that a complete system check must be performed after commissioning and after every modification of the customer data programming (Page 6, 27) [1].
For diagnostic and servicing tasks, the tools 8000 programming software is required, as it contains the necessary tools for system verification (Page 9) [1].